Design Structure - Weir Mill Wadhurst

Cantilevered & Truss-Out Scaffold Solution for Constrained Urban Building

Tiger Scaffolding Ltd was appointed to design, supply and erect a complex scaffold structure to provide safe access for refurbishment works to a historic building positioned directly over an active watercourse and mill race.

 

The project presented a number of unique challenges due to restricted access, flowing water below, sensitive historic fabric and the requirement to maintain public and environmental safety throughout the works.

 

Project: Specialist access scaffolding over live watercourse
Sector: Heritage
Location: Weir Mill, Wadhurst
Client: Private Client
Services Provided: Design, Supply & Installation of Temporary Access Scaffolding

The Challenge

The scaffold was required to span over a live water channel, with limited opportunities for traditional ground-bearing foundations. Additional challenges included:

    •    Working above flowing water and uneven stone structures

    •    Restricted access within a narrow corridor between masonry walls

    •    Protection of operatives and the public below

    •    Maintaining the integrity of historic features

    •    Limited tie locations and complex load paths

 

All works had to be completed while ensuring compliance with current HSE guidance, TG20, and bespoke engineering requirements.

​​​​

Our Solution

Tiger Scaffolding delivered a bespoke, engineered scaffold solution tailored specifically to the constraints of the site.

 

Key elements of the solution included:

    •    Bridged and suspended scaffold sections spanning the watercourse

    •    Beam arrangements to distribute loads safely where traditional standards were not viable

    •    Fully boarded working platforms with double guardrails and toe boards

    •    Debris netting to safeguard the watercourse and surrounding areas

    •    Carefully positioned ties and supplementary bracing to maintain stability without impacting the historic structure

    •    Safe access routes for operatives within confined spaces

 

All designs were supported by engineering calculations and method statements prior to installation.

Tiger Scaffolding 14.heic

Our outcome 

The completed scaffold provided:

Safe, uninterrupted access to all required areas

A stable and compliant working environment for follow-on trades

Minimal disruption to the property and surroundings

A visually neat and professional scaffold installation

The project was delivered safely, on programme, and to the client’s satisfaction.

Tiger Scaffolding 44.heic
tiger scaffolding white and orange_edited_edited_edited.png

Safety & Compliance

Safety was paramount throughout the project. Tiger Scaffolding implemented:

    •    Site-specific risk assessments and method statements (RAMS)

    •    Full compliance with NASC guidance and TG20

    •    Regular formal scaffold inspections

    •    Close coordination with the principal contractor and site management

    •    Environmental considerations to protect the watercourse below

 

Our operatives worked to strict permit controls and maintained excellent housekeeping standards at all times.​​

The Result

The scaffold was delivered safely, on programme and without incident. The completed structure provided secure, uninterrupted access for follow-on trades while protecting both the historic building and the surrounding environment.

The client praised Tiger Scaffolding for our technical expertise, attention to detail and ability to deliver a complex solution in a highly constrained location.

Why Tiger Scaffolding?​

This project highlights Tiger Scaffolding’s ability to:

    •    Deliver complex, engineered scaffold solutions

    •    Work confidently in restricted, high-risk and sensitive environments

    •    Support heritage and infrastructure projects

    •    Maintain the highest standards of safety, compliance and workmanship

Project Highlights

✔ Bespoke scaffold design

✔ Complex bridged beam sections

✔ Multiple working levels

✔ Fully compliant and safety-led delivery

✔ London & South East project